Bell Boulevard Water Main Extension

Project Title: Bell Boulevard Water Main Extension Project Construction Cost: $1,934,730.00 Estimated Project Completion: Fall 2023 Contractor: Denco Construction, Inc. System: Lehigh Description: Installation of approximately 11,000 LF of 12” water main along Bell Boulevard from the intersection of Shadow Lakes Drive south to approximately the intersection at Long Island St. East in Lehigh Acres. […]

Amelia Island WTP Booster Pump Modification Project

Project Title: Amelia Island WTP Booster Pump Modification Project System: Nassau Amelia Utility Description: The Booster Pump Modification Project will replace the existing booster pump station located on the Omni property in Amelia Island.  The new pump station will include a new 1-million-gallon ground storage tank, seven (7) split case pumps, a 500kW standby generator […]

American Beach Water and Sewer District Well and Septic Tank Phase Out Program

Project Title: American Beach Water and Sewer District Well and Septic Tank Phase Out Program System: Nassau Amelia Utility Description: The American Beach Well and Septic Tank Phase Out Program will provide municipal water and sewer utilities to the American Beach community.  The project includes 2 ½ miles of sanitary sewer, 52 manholes, two (2) […]

Plantation Bay Wastewater Treatment Plant (WWTP) Phase II Improvements

Project Title: Plantation Bay Wastewater Treatment Plant (WWTP) Phase II Improvements System: Flagler Description: The Plantation Bay WWTP treatment plant’s treatment process equipment is at the end of its useful life and requires replacement.  The Phase II Improvements project will provide a new digester, aeration basin and clarifier as the primary biological treatment process.  The […]

Plantation Bay Water Treatment Plant (WTP) Miscellaneous Improvements

Project Title: Plantation Bay Water Treatment Plant (WTP) Miscellaneous Improvements System: Flagler Description: The Plantation Bay WTP’s lime softening process and equipment is at the end of their useful life and requires replacement.  The miscellaneous improvements project includes abandonment of the existing lime softening equipment and installation of new nanofiltration equipment.  The project also includes […]

DUP 15 (Rio Vista Septic-to-Sewer Project)

Project Title: DUP 15 (Rio Vista Septic-to-Sewer Project) System: Dunnellon Utility Description:   Rainbow River – Rio Vista Septic to Sewer Project FGUA is undertaking a septic to sewer project in the Rio Vista community located in the City of Dunnellon.  The project consists of connection of approximately 333 septic tanks from single family homes in […]

DUP 12 (Chatmire Septic-to-Sewer) Project

Project Title: DUP 12 (Chatmire Septic-to-Sewer) Project System: Dunnellon Utility Description:  FGUA is undertaking a septic to sewer project in the Chatmire community located in the City of Dunnellon.  The project will include 210 residential lots with approximately 117 existing septic systems, 14,000 linear feet of gravity sewer collection lines, 1,640 linear feet of force […]

Amelia Island WTP Booster Pump Modification Project

System: Nassau Amelia Utility Description:  The Booster Pump Modification Project will replace the existing booster pump station located on the Omni property in Amelia Island.  The new pump station will include a new 1-million-gallon ground storage tank, seven (7) split case pumps, a 500kW standby generator and associated electrical and controls equipment.  The new ground […]

American Beach Water and Sewer District Well and Septic Tank Phase Out Program

System: Nassau Amelia Utility Description:  The American Beach Well and Septic Tank Phase Out Program will provide municipal water and sewer utilities to the American Beach community.  The project includes 2 ½ miles of sanitary sewer, 52 manholes, two (2) sewer lift stations, 2 ½ miles of water main, seven (7) fire hydrants, and eight […]

MD901 (FGUA Administrative Building at McDill Airforce Base)

System: McDill Utility Description:  FGUA and its operational staff have been located in temporary trailer offices for several years.  FGUA has undertaken the design and construction of a permanent FGUA administrative building to house the onsite staff.  AECOM is providing architectural and engineering services for the building and site facilities.  The new administrative building is […]