Project Title: Amelia Island WTP Booster Pump Modification Project
System: Nassau Amelia Utility
Description:
The Booster Pump Modification Project will replace the existing booster pump station located on the Omni property in Amelia Island. The new pump station will include a new 1-million-gallon ground storage tank, seven (7) split case pumps, a 500kW standby generator and associated electrical and controls equipment. The construction contractor, Sawcross, has completed the construction of the new ground storage tank, have installed underslab piping and electrical conduits at both the electrical and pump building’s, the electrical building’s base slab has been cast and the majority of the buried piping has been installed. The project is scheduled for completion in May 2023.