Project Title: Bell Boulevard Water Main Extension
Project Construction Cost: $1,934,730.00
Estimated Project Completion: Fall 2023
Contractor: Denco Construction, Inc.
System: Lehigh
Description:
Installation of approximately 11,000 LF of 12” water main along Bell Boulevard from the intersection of Shadow Lakes Drive south to approximately the intersection at Long Island St. East in Lehigh Acres. The purpose of the project is to provide a potable water transmission main and leave stub outs for future expansion and to provide interconnections to two water treatment plants.