Floramar Terrace Force Main Relocation Project, New Port Richey, Pasco County, FL (FGUA Lindrick Service Area)

September 9, 2021

This project involves the construction of approximately 2500 feet of wastewater forcemain from an existing wastewater pump station to an existing forcemain along US 19. This project is designed to reroute wastewater flow from underneath an existing channel to a route along Floramar Terrace, eliminating the potential for a sewer spill within the channel and improving overall system operation. The project will take advantage of state of the art directional drill pipe construction, saving money and minimizing disruption to the neighborhood.

The project is under design; construction is schedule to begin in January 2022 and will take approximately 6 months.