Project Title: Plantation Bay Wastewater Treatment Plant (WWTP) Phase II Improvements

Project No: FRP10

System: Flagler

Description:  The Plantation Bay WWTP treatment plant’s treatment process equipment is at the end of its useful life and requires replacement.  The Phase II Improvements project will provide a new digester, aeration basin and clarifier as the primary biological treatment process.  The project will provide Class I reliability and increase plant capacity.  In May ‘23, Mack Industries, Incorporated was awarded the extended aeration basin and equipment construction and installation.  On January 24th, 2024, Mack placed the concrete slab for the pre-cast, post-tensioned concrete structure. The extended aeration basin inclusive of the concrete structure and mechanical equipment will be substantially complete by October ‘24.  Mack’s construction contract does not include civil, site, mechanical piping outside the aeration basin and all electrical.  This trade work will be bid as a separate project once the concrete structure is approximately 50% complete.

Picture1
Figure 1: Concrete Placement of the pre-cast, post-tensioned concrete structure
Skip to content