System: Flagler
Description: The Plantation Bay WTP’s lime softening process and equipment is at the end of their useful life and requires replacement. The miscellaneous improvements project includes abandonment of the existing lime softening equipment and installation of new nanofiltration equipment. The project also includes various miscellaneous items aimed to increase treatment reliability and to provide a more consistent and disinfection byproduct free drinking water to the customers in the FGUA Flagler system. The pilot study for the nanofiltration facility was complete in February 2022. The design notice to proceed was issued to Wade Trim January 11th, and the design is currently underway. Construction of the new facilities is expected to commence late 2022.