Project Title: Plantation Bay Water Treatment Plant (WTP) Miscellaneous Improvements
System: Flagler
Description:
The Plantation Bay WTP’s lime softening process and equipment is at the end of their useful life and requires replacement. The miscellaneous improvements project includes abandonment of the existing lime softening equipment and installation of new nanofiltration equipment. The project also includes various miscellaneous items aimed to increase treatment reliability and to provide a more consistent and disinfection byproduct free drinking water to the customers in the FGUA Flagler system. A pilot study for the nanofiltration facility was completed in January 2022. Design is nearing 100% complete. Due to projected construction costs, FGUA is pursuing a State Revolving Fund (SRF) loan to sponsor the construction phase of the project.