Project Title: Plantation Bay Water Treatment Plant (WTP) Miscellaneous Improvements

System: Flagler

Description:  The Plantation Bay WTP’s lime softening process and equipment is at the end of their useful life and requires replacement.  The miscellaneous improvements project includes abandonment of the existing lime softening equipment and installation of new nanofiltration equipment.  The project also includes various miscellaneous items aimed to increase treatment reliability and to provide a more consistent and disinfection byproduct free drinking water to the customers in the FGUA Flagler system.  The pilot study for the nanofiltration facility was complete in February 2022.  The design is 100% complete, and the design team is reviewing technical submittals for the nanofiltration skids. Upon approval of the skids and related appurtenances, the skids will take 8-10 months to fabricate.  The project is being delivered in two phases.  Phase I is the owner direct purchase of the nanofiltration skids.  Phase II of the project which will be bid in April 2024 includes the construction of the new nanofiltration building, mechanical, electrical and instrumentation components of the project.  The overall construction is expected to be complete early 2025.

Picture1
Figure 1: Nanofiltration Skids Schematic
Skip to content