Project Title: Plantation Bay Water Treatment Plant (WTP) Miscellaneous Improvements
System: Flagler
Description: The Plantation Bay WTP’s lime softening process and equipment is at the end of their useful life and requires replacement. The miscellaneous improvements project includes abandonment of the existing lime softening equipment and installation of new nanofiltration equipment. The project also includes various miscellaneous items aimed to increase treatment reliability and to provide a more consistent and disinfection byproduct free drinking water to the customers in the FGUA Flagler system. A pilot study for the nanofiltration facility is anticipated to commence by November 2021. The pilot study will be conducted over approximately two months. The detailed design of the new facilities will follow the pilot study. Construction of the new facilities is expected to commence quarter 3 2022.
Location Map: